20130827_18583920130827_182541

20130827_193443

 

Today was our first meeting of the year!! We moved our tools from Wayne’s garage into our hanger at Hap’s airport in ames. The plan for todays meeting was to put on both wings and bolt them in place. We realized that we didn’t have the holes for the pitot and static tubes drilled yet. So we successfully did that, and then drilled bigger holes for the control cables. We put the pitot and static tubes through their respected holes along with the control cables. Next week we plan on putting the fuel lines in, putting the other wing on and bolting both wigs in place.