Tonight we completed a few projects!  We finally riveted the box that connects the hose through to supply heat to the cabin.  On the right wing we fixed the grommets and then refit the rubber piece so that they were flush with the fuselage.  We started to fix the baffling so that it wouldn’t vibrate and hit the cowling.  We successfully attached the prop and nose cone!

The box that connects the heat to the cabin was riveted on.

The box that connects the heat to the cabin was riveted on.

The right wing was reattached after changes were made.

The right wing was reattached after changes were made.

John working on the propeller.

John working on the propeller.

Bolting the propeller on.

Bolting the propeller on.

The full plane with both wings and the prop on!

The full plane with both wings and the prop on!